case Studies

  • Hamadryad Court

    • Client: CCHA
    • Description: The remediation scope for Hamadryad requires the removal of non-compliant HPL cladding and its replacement with A1 Rock Panel, including associated Vitradual A1 aluminium flashing and window casements. The internal masonry cavity was remediated with Injectaclad to BS 1366 Part 4. The works are being carried out in occupied premises, with the V3 Group RLO liaising with residents and the site team. Cardiff City Council has been appointed as the building inspectors.
    • Value: £1m
    • Start Date: Nov 2024
    • End Date: May 2025
  • Galleon House

    • Client: CCHA
    • Description: The scope of works at Galleon HRB required the removal of non-compliant ESP wall cladding and its replacement with a Wetherby A1 mesh system external Rockwool insulation system to PAS 2035. The Juliet balconies were removed and extended to accommodate the increased depth of Rockwool to achieve Building Regulation compliance with Part L. Vertical cedar cladding was removed and replaced with rainscreen Rock Panel and associated fire barriers to meet Part B compliance. The works have been completed in phases per elevation within occupied premises, with the V3 Group RLO liaising with residents and the site team. Cardiff City Council has been appointed as the building inspectors.
    • Value: £1m
    • Start Date: Dec 2024
    • End Date: June 2025
  • Coleg Y Cymoedd

    • Client: Kier Construction
    • Description: Kingspan KingZip standing seam roof coverings & wall cladding. PolyPac Arcoplus 547A+ Interlocking polycarbonate cladding panels. Alumasc Derbigum roof covering. All polyester powder coated aluminium flashings. Critical safety systems that included the roof mansafe & roof CAT access ladder. Liquid GRP detailing to the windcatchers & louvre posts where they penetrated the capping.
    • Value: £650,000.00
    • Start Date: Aug 2022
    • End Date: Feb 2023
  • Harbour Quay

    • Client: Coastal Housing Group & LSCW Ltd
    • Description: Façade Scaffold & Complete Window , Curtain Wall , Door & Patio Doors and Glazing Replacement
    • Value: £3m
    • Start Date: Oct 23
    • End Date: Oct 24
  • Port of Leith

    • Client: Colorado Construction
    • Description: 2000m2 of TATA Trisobuild Built Up Cladding system, finished in a sharp Jet Black finish. 200m2 of 3mm Aluminium PPC Feature Surrounds to Curtainwalling and Windows, finished in a standout Copper lookalike finish. SFS Secondary Steel Framing First and Only Vertical Distillery in Scotland. More Info on links below.
    • Value: £500,000.00
    • Start Date: April 2022
    • End Date: October 2022
  • Chocolate Box

    • Client: Grey GR Ltd & LSCW Ltd
    • Description: Scaffold erection & shrink wrap to facilitate removal of non-compliant facade materials and replacement with A1 Kawneer rainscreen cladding and curtain walling. Duplex penthouse HPL cladding removal and replacement with A1 cladding system.
    • Value: £4.5m
    • Start Date: Feb 2024
    • End Date: July 2025
  • The Milliners

    • Client: Grey GR Ltd & LSCW Ltd
    • Description: Scaffold erection with temporary roof to facilitate removal of non-compliant facade materials and replacement with Vitradual  A1 rainscreen cladding and Shackerly ceramic and stone cladding. Sixth floor Kawneer windows and patio doors.
    • Value: £5.5m
    • Start Date: Feb 2024
    • End Date: Oct 2025